Security / Intelligent Systems


TSA Hi-SOC – Logan International Airport
Client: Transportation Security Administration
Contractors: Unisys, Essex Newbury North
Responsible for all electrical, data and telecommunications work at Logan Airport included in the High Speed Connectivity (Hi-SOC) statement deployed throughout the U.S. to improve Transportation Security Administration connectivity and communications.
Completion: On-going

Boston Homeland Security – Boston Multiple Sites
Client: City of Boston
Construction Manager: Live Wave – Smith Detection
Installation and wiring of security cameras and systems in various urban outdoor locations
Completion: On-going

MBTA South Station Finishes
Client: MBTA
Contractor: J.F.White Contracting Co.
Renovation of existing station included installation and/or relocation of lighting, fire alarm and security systems for lobby level, red line and silver line. All work was performed with minimal impact to public as the station was kept open during construction.
Completion: September 2006

Newton Wellesley Hospital Security
Client: Newton-Wellesley Hospital
Contractor: Surveillance Specialties
Installation and wiring of security system in new wing along with relocation of existing card readers
Completion: December 2006

MBTA Quincy Center Station/Parking Garage CCTV Installation
Client: MBTA
Contractor: Sonet Electrical Systems
Installation and wiring of security equipment interfacing with Live Wave software for real time viewing via the Internet
Completion: May 2005

Logan International Airport  Baggage Screening
Client: Vanderlande Industries and FKI Logistics
Performed electrical work to upgrade four baggage handling rooms designed to meet the new "Home Land Security" FAA regulations without disrupting the daily operation of the existing system.
Completion: August 2003

Boston Homeland Security - Boston
Client: City of Boston
Construction Manager: Live Wave – Smith Detection
Installation and wiring of security cameras and systems in various Boston area buildings
Completion: April 2006

Logan International Airport Raytheon X-Ray Project
Client: Raytheon
GC: Essex Newbury North
Installation of new state of the art X-Ray for United Airlines Baggage Area
Completion: March 2002

Landmark Center CCTV and Access Control
Client: Blue Cross Blue Shield
Contractor: Surveillance Specialties
Provided wiring for the installation of new access control system and CCTV in occupied office area of Blue Cross Blue Shield.
Completion: September 2005

Telecommunications


Air Canada Terminal Upgrade
Client: Air Canada
Contractor: Essex Newbury North
Sub Contractor: Sonet Electrical Systems Inc.
This terminal upgrade at Logan Airport included Installation of voice and data structured cabling, relocation and programming of Meridian Phone switch, installation and Integration of overhead paging system and relocation of radio and antenna systems.
Completion: February 2007

AT&T Local Services
Client: AT&T
Contractor: Sonet Electrical Systems Inc.
Installation of copper and fiber optic risers. DC power plant, DSX1,and DSX3 circuits, OC12, OC48, DSLAM equipment, common space nodes and CLECS.
Completion: On-going

MBTA Orange Line Signal Replacement
Client: MBTA
Contractor:  J.F.White Contracting Co.
The replacement of the Haymarket North Signal System included 18 miles of 48 strand single mode fiber optic cable and 118 miles of signal cable. The fiber optic cable, interconnecting instrument houses is used to report real time information to the signal tower and operation control center.
Completion: On-going

Helind Electronics
Client: Helind Electronics
Contractor: Sonet Electrical Systems
Construct fully operational computer room. Relocate and rewire existing IBM servers, AT&T services, UPS and networking equipment.  Furnish and install new fire alarm, lighting and card entry systems.
Completion: December 2006

Triad Communications Group
Client: Triad Communications Group
Contractor: Sonet Electrical Systems Inc
Installation of DSX1 and DSX3 circuits and copper and fiber optic risers throughout the City
Completion: On-going

Intralinks 99 Bedford St. Boston, Ma.
Client: Intralinks Inc.
Contractor: Sonet Electrical Systems Inc.
Installation of Voice and Data structured cabling and IDF closet
Completion: December 2006

Gibbs College Newbury Street Renovation
Client: Gibbs College
Contractor: Sonet Electrical Systems Inc
Installation of voice and data structured cabling of 4 floors of occupied space.
3 new IDF closets and 1 MDF with fiber optic backbone.
Completion: December 2005

Commercial / Institutional


Nordstrom- Natick
Client: Nordstrom
Contractor: Ibex Construction
Responsible for all electrical work in this new 144,000 square foot high-end retail store. Some major components of work include power, lighting, security, fire alarm and energy management systems.
Completion: On-going

Tufts University – Music Building
Client: Tufts University
Contractor: Linbeck
Completed all electrical work for power distribution, security, and fire alarm including special systems for lighting, dimming and audio visual for this state of the art performing arts center.
Completion: January 2007

Genzyme – Framingham
Client: Genzyme
Contractor: Harris Environmental Systems
Complete wiring of 8 environmental rooms, six cold rooms and two warm rooms with Harris Environmental equipment including intelligent alarm systems.
Completion: On-going

Beth Israel Hospital
Client: Beth Israel Hospital
Contractor: Minus-Eleven
Provide all wiring and terminations for all environmental equipment in clean room
Completion: May 2006

Saks Fifth Avenue – Interior Renovations
Client: Saks Inc.
Contractor: J. Tucci
Responsible for electrical work in the renovation of this high-end Back Bay retail store and the vendor shops housed within the store. This construction will be completed while keeping the store open to customers.
Completion: On-going